It's been a busy week, lots of holiday preparations, not much stitching stuff the last few days. I did work in a few stitching sessions in the sewing room before the holiday schedule completely took over.
- guild bom
- Page 1 of 2 ( posts )
- next
It's been one of those weeks where life hasn't gone as expected. My uncle passed after a short illness, he was 87. My mother really wanted to go to the funeral originally scheduled for the 9th, but she has health issues that make an 8 hour road trip difficult. I agreed to take her, but we'd break the trip up over a couple of days. We made the trip from her house to mine on Saturday. Then the aunt who was married to the uncle, was found unresponsive by their son. She passed the next day, so ...
read moreNovember was a quiet month, well except for Thanksgiving week. I got a lot done so there's a bit to report for the November PHD report at P Designs USA. Though you won't see a lot of progress reflected on my PHD spreadsheet.
No finishes in November, but one new start. But the Bonnie Hunter mystery has been on the list since the beginning. Besides the clues won't end till the new year, so it's not one that has to be finished this year. I'm hoping to have one more finish this month, so hopefully ...
read moreWe were in Texas for most of the week, so I didn't have a lot of time to sew. Consequently, last week's to do list was pretty simple.
To Do List 11/26/2024
1. Old Town Mystery: Finish clue 1 and start clue 2- progress
2. Embroidered Medallion: Take a few stitches ✔
3. Wild and Goosey: Continue making red blocks ✔
4. Summer Scrap Quilt: Continue as leaders and enders ✔
With all our holiday travel I only had one day in the sewing room, so I'll take three check marks and progress on the 4th.
I should ...
read moreMid-November has come and gone. Thanksgiving is next week. I'm really not ready for the holiday to ramp up and the year wind down. But as I don't have a choice, it's time to just go with the flow. I've been keeping my to do list's pretty simple and it's paying off with good progress.
It finally feels like autumn here. It's been pretty chilly in the mornings, but warmer in the afternoons. We seem to be done with the highs in the 80s. I'm hoping to get back to my photography walks this week, assuming it stays dry most of the week. Before I get to far into on what else is on the list for this week, here's how I did with last week's to do list.
It's been a very weird autumn. October was cooler than September, but not by much. My sewing room was my preferred location for most of the month. That means I have lots to blog about for the October PHD Report posted over at P Designs USA.
It's been nice to be home for a stretch. I was able to get some chores done last week that really needed to get done. It's easier to wander off to the sewing room if the house is at least reasonably in order. The sewing room time has been paying off, there was good progress on last week's to do list.
To Do List for 10/29/2024
1. String Lights: Package and mail out for quilting ✔
2. Chocolate Marshmallows: Continue assembly ✔
3. Wild and Goosey: Continue making blocks ✔
4. Sensational Summer Scrap Quilt: Continue as leaders ...
read moreWe got home late Saturday afternoon from vacation. So I had Sunday and Monday to work on the non-hand stitching part of my to do list. With that in mind, I didn't do too badly with on the list for last week.
To Do list For 10/01/2024
1. Diatom: Finish hand stitching binding ✔
2. Guild BOM: Start October block ✔
3. Marble Mystery: Start October clue ✔
4. Chocolate Marshmallows: Decide layout, start assembly - progress
5. Wild and Goosey: Finish orange blocks - progress
6. Sensational Summery Scrap quilt: Continue as leaders/enders ✔
Considering we were on vacation last week ...
read moreSeptember was just a weird month for some reason. I guess because, though it has cooled off some, it was still pretty warm. Didn't feel like autumn at all. At any rate, the higher temps made the sewing room the place to be so I got a lot of stitching done this month. So there is plenty to report for the September PHD Report linky party over at P Designs USA. Here's my PHD report for the last month.
It's October! I'm really not ready for that reality. We've got a lot going on this month, so I'm sure it will go faster than September. Oh well, at least I got a lot done last week.
To Do list for 09/24/2024
1. Rhododendron: Finish binding ✔
2. Diatom: Make label, binding, trim, sew on binding ✔
3. Guild BOM: Make September block ✔
4. Chocolate Marshmallows: Decide on setting ✔
5. Wild and Goosey: Continue making orange blocks ✔
6. Sensational Scrap Quilt: Continue as leaders and enders ✔
Six for six last week. I took the finishing of ...
read moreWith all the hot, hot days in August, the sewing room was the nicest place to hang out most days. Consequently there was a lot of progress on the various projects. Now that we've moved into September it's time to link up with P Designs USA for the August PHD Report.
Another finish added to the chart with no new starts. That's definitely a good month. So I'm up to three finishes for 2024. The latest finish was my 2024 Stay at Home Round Robin (Quilting Gail) project.
This quilt, named The Shadow Demon, is destined ...
read moreIt's been another hot week, so the sewing room was my favorite place to be. My shoulder issues did require me to minimize my time early in the week, but by the end of the week, I could sew for more than my 15 minutes each day. That made it much easier to tackle the to do list.
To Do List for 08/13/2024
1. 2024 SAHRR: Finish binding ✔
2. Indigo Way: Add last border ✔
3. Diatom: Finish sashing, start borders ✔
4. Guild BOM: Make August block - progress
5. Wild and Goosey: Continue making orange blocks ✔
6. Sensational ...
read moreWe'll pass mid-August this week. It really does feel like time speeds up as we get closer to the end of the year. Didn't we just pass mid year? How can it already be almost two thirds overs? I should calm down, there is still half of August left, so still time to make lots of progress on my quilting plan.
July wasn't nearly as busy as June, so there was a lot more time for playing in the sewing room. Enough playing that there is finally an update to the PHD report.
Just two finishes so far this year, but I'm doing better than last year when my first finish wasn't till September and the second finish wasn't till November.
The finish for July was the 2023 Stay at Home Round Robin (Quilting Gail).
I'm really happy with how this one turned out. My Guy really likes it. That's a good thing because it ...
read moreLast Sunday's post noted just how out of it I felt during most of last week. Saturday allowed for a reset and I managed to get back up to speed on a number of things, including last week's to do list.
To Do List for 07/09/2024
1. 2023 SAHRR: Finish binding ✔
2. Kates' Choice: Continue making blocks ✔
3. Guild BOM: Finish June block, start July block ✔
4. Wild and Goosey: Finish blue blocks, start teal blocks ✔
5. Indigo Way: Finish setting triangles, start assembly ✔
I'm 5 for 5 for last week, a definite improvement over ...
read moreIt's been a whirl wind couple of days. We went to Texas to visit Grad Girl for the 4th of July weekend. We had planned to stay till Monday to avoid the homeward bound traffic from 4th of July. Those plans changed when they issued tropical storm warnings for Brazos county due to Beryl. We had a serious rethink and left late Sunday afternoon to drive to Dallas. It's pretty flat in that part of the state and it doesn't take much for parts of the roads to flash flood, so it just seemed wise to avoid ...
read moreHard to believe that we've already passed the half way mark on the year. June was busy with lots of non sewing stuff, so though I managed to keep up with my stitching time, there's no progress in my PHD Report.
No new starts, so that's a positive. But no new finishes. Even so there was good progress towards making that happen in July.
My second oldest UFO was moved along and underwent a name change as well. What started as the Grandmother's Choice quilt along with Barbara Brackman is now Kate's Choice as I ...
read moreWe had heavy rains with strong winds over the weekend, followed by high humidity which has made it just miserable to be outside. I had to run errands a couple of days last week and came home needing naps afterwards. I'm pretty sure one day I got dehydrated and just felt crappy for most of the day. All that to say, I didn't make as much progress on my to do list as I had hoped.
To Do List 06/25/2024
1. 2024 SAHRR: Prep for quilting ✔
2. Kate's Choice: Continue making blocks ✔
3. Guild BOM ...
read moreI didn't post a to do list for last week since I was at the conference for the week and then knew I'd be at Grad Girl's cat sitting over the weekend. There was some progress on the to do list from the 11th before the long drive to Texas.
- guild bom
- Page 1 of 2 ( 35 posts )
- next